Glossary
The terms that come up most in our work, defined plainly.
- Behind-the-meter generation
- Power produced on the customer's side of the utility meter, such as on-site gas turbines or solar, serving a facility directly rather than through the grid.
- Capacity market
- A market in which grid operators pay resources to be available in future years, separate from payment for energy actually produced.
- Direct-to-chip cooling
- Liquid cooling in which coolant flows through cold plates mounted on processors, removing heat closer to its source than air cooling.
- FERC Order No. 2023
- A 2023 Federal Energy Regulatory Commission rule reforming generator interconnection procedures, including a move to cluster studies and stricter readiness requirements.
- Firm supply
- Generation that can be relied on to deliver power when called upon, regardless of weather.
- Immersion cooling
- Cooling in which servers are submerged in a non-conductive fluid that absorbs heat directly from components.
- Interconnection queue
- The list of projects that have requested connection to a transmission system and are awaiting study and approval.
- Large-load interconnection
- The process by which a major electricity consumer, such as a data center, obtains a grid connection and service from a utility.
- Power purchase agreement (PPA)
- A long-term contract to buy electricity, or its attributes, from a specific generator at agreed terms.
- Power usage effectiveness (PUE)
- Total facility energy divided by IT equipment energy. A value of 1.0 would mean no energy is used for cooling or other overhead.
- Substation
- A facility that transforms voltage between transmission and distribution levels and switches power flows.
- Utilisation
- The share of time, or of capacity, that equipment is actually used over a given period.